The Bitmain Antminer S21 Hydro (335 TH/s) represents the pinnacle of high-density liquid cooling for enterprise Bitcoin mining. Generating an astonishing 335 TH/s from a single chassis at 16.0 J/TH, the S21 Hydro replaces traditional high-decibel screaming fans with closed-loop liquid cooling plates, delivering whisper-quiet operation, dust immunity, and extreme longevity.
Technical Specifications
| Specification | Technical Metric |
|---|---|
| Model | Antminer S21 Hydro |
| Manufacturer | Bitmain |
| Algorithm | SHA-256 (BTC / BCH) |
| Hashrate | 335 TH/s ±3% |
| Power Consumption | 5,360 W ±5% |
| Energy Efficiency | 16.0 J/TH |
| Input Voltage | 380–415V 3-Phase AC, 50/60 Hz |
| Cooling Technology | Closed-Loop Liquid Cold Plates |
| Coolant Requirements | Deionized water / Distilled water with corrosion inhibitors |
| Flow Rate Requirement | $\ge 8.0\text{ Liters/minute}$ |
| Acoustic Noise | $\le 50\text{ dB}$ (Miner unit itself) |
| Net Weight | 16.1 kg |
Fluid Dynamics & Thermal Engineering
Liquid cooling provides profound thermodynamic advantages over atmospheric air:
- Heat Capacity of Water: Water has over 4 times the specific heat capacity and 24 times the thermal conductivity of air. This enables the S21 Hydro to dissipate 18,288 BTU/hr of thermal energy while maintaining chip junction temperatures below 65°C.
- Coolant Quality Standards: Closed loops must utilize pure deionized water with anti-corrosion and anti-algal additives. Water electrical conductivity must remain below $100\ \mu\text{S/cm}$ to protect micro-channel cold plates against galvanic degradation.
- Heat Reuse Opportunities: Because the liquid coolant exits the chassis at 50°C to 60°C, facility operators can integrate heat exchangers to recycle waste heat for commercial greenhouse agriculture, residential district heating, or industrial preheating.
3-Phase Industrial Electrical Distribution
At 5,360 Watts, the S21 Hydro cannot be operated on ordinary residential circuits:
- Requires a balanced 3-Phase 380V–415V AC power supply.
- Phase current is balanced across three lines at approximately 7.5 to 8.2 Amps per phase, drastically reducing conductor thickness and cable heat compared to single-phase equivalents.
- Standard industrial connectors (such as IEC 60309 or specialized terminal blocks) are mandatory.
Operational Economics & Energy Efficiency (USD)
Operational electricity costs under international industrial power contracts:
- At $0.04/kWh: Daily power cost is $5.15. With 335 TH/s compute output, net cash flow yields are among the highest in the entire global mining market.
- At $0.06/kWh: Daily power cost is $7.72, maintaining robust positive margins.
- At $0.08/kWh: Daily power cost is $10.29, comfortably outpacing air-cooled competitors due to zero fan power overhead.
Model your facility’s customized hydro economics on the ASIC Profitability Calculator.



